top of page

Isaac Garcia

Joe King (Project Manager)

 

ABOUT US

My name is Joseph King and I am the project manager for this project. I will be assiting all team members with each of their tasks, in addition to maintaining our design schedule. My main tasks include assisting with the structural design and leading the geotechnical design.Throughout this process I will be consulting with our industry adviser in order to ensure our project is held to the highest professional standard.

My role in the project will be concentrated towards the stringer and deck joint design. During the design of the stringer, I will focus on the designing an appropriate member based on New Jersey Turnpike Association (NJTA) specifications. I will be collaborating with Jonathan Raybould to assess and implement the appropriate deck and deck joint designs. The project looks challenge us in analyzing and designing an appropriate bridge structure in a practical environment.

Michael Trull

Jon Raybould

My name is Jon Raybould.  I will be in charge of designing the girder and overhang of the bridge.   I will be using AASHTO specifications as well as NJTA specifications to approapriatly design the girders as well as the overhang.  

My name is Michael Trull.  My role in designing the I-95 bridge over Mill Lane is to model the bridge in VisualAnalysis and Civil CAD.  I will determine the critical loading according to AASHTO specifications for Service and Strength 1.  I also will collaborte with Isaac Garcia and Jon Raybould to evaluate the various capacities of selected girder.

bottom of page